IGL
Non connectivity
- 05-16-2009
- 64
We wanted to know the reason behind the non connectivity for the gasline with my gas lines.
The infrastructure for the gas pipeline has been installed in my house in December -January and the testings were completed in January itself.
However the end termination of the pipeline to my gas burners has no been done from then and despite neumourous complains to the local vendors of the IGL who touched base with us at the time of installations have failed despite neumourous attempts.
I booked my gas on 22/11/08 with the local vendors.
Company: IGL
Country: India