Incomplete & inferior construction of back side service lane & blockage of main hole
I the undersigned am resident of rz 1/14 street no 4 tuglakabad extn, New Delhi -19 and having a complaint regarding problems due to incomplete and defective construction of back side service lane and street Road. Just few months back our area has issued a contract for construction of cemented road. The contractor has not even constructed the Road and repair the drainage system (Nala) on both side of the road. What contractor did is purely eye wash.
For the last approximately 3 months construction of street road/Sewerage system in back side of our houses was going on causing hell of problems to us. Apart from the fact that the patches have been left open incomplete:
1. This nala has been excavated from many locations in the street.
2. No MCD workers has been even tried to open the drainage system, with charging the culprits.
3. Now being monsoon there is more danger. Drainage system is not proper and the road is completely damaged and our living conditions are so bed due to water lodging in streets.
4. Due to uneven levels the water is stinking and mosquitoes have been increased posing threat to life.
5. May I request you to look into this matter seriously and save us from life long problems?
We sincerely request you to ask the concerned authority, which so ever is responsible to immediately corrects the faults and complete the project without any further delay and damage.
Company: A
Country: India