NORTH DELHI POWER LIMITED
LONG POWER CUTS AT MIDNIGHT & WITHOUT PRIOR INTIMATION
- 04-30-2008
- 125
Hi,
Our meter connection is with Indra Nagar area (district Model Town, Delhi) & we reside in Adarsh Nagar. In last fortnight there is a regular power cut of atleast 4-5 hours a day without any prior intimation/schedule of power cut. So much planned are the power cuts that since last 8-10 days power is going off systematically. Like in last 7 days power cuts were from 7 pm to 8 pm (22.4.08), 8 pm to 9 pm (23.4.08), 9 pm to 10 pm (24.4.08), 10 pm to 11 pm (25.4.08), 11 pm to 12 pm (26.4.08), 12 pm to 1 am (27.4.08) & yesterday (i.e. 28.4.08) cut was from 1am to 2am.
On one hand NDPL & other distcoms & even Delhi Govt. is saying that right now there is no power shortage but still such a systematic power cuts that too without prior intimation & for long 4-5 hours are going on This irrational & inhuman decision of power cuts in midnight (12pm, 1am, 2am) is totally unprofessional & unacceptable.
As a bonafide & honest bill paying consumer, may I have the liberty to ask
a) the reason for such long power cuts;
b) why prior intiamtion or schedule of cuts is not being given to consumers;
c) Why cuts are there in midnight;
d) If Delhi Govt. is saying that there is enough power than why these power
cuts?
Looking forward to your prompt reply at earliest.
Regards:
Ankush Munjal
Company: NORTH DELHI POWER LIMITED
Country: India