Cesu
Meter change
Respected Sir, After submitting the application on Dt.09.11. still now new meter has not been replaced with OLD FAULTY METER.After givinig a number of visit to UNIT-2 ELECTRIC SUB STATION (nearly 30 visits) regarding the above but the result is same. During last three visit on Dt.25.05.2011 (for ...