Bangalore City Corporation
Removal of Debris
Sir, The manholes at 19th A Cross of Egipura was below the road level as the concreting of the road was done about an year back. After a period of nearly 6/8 months the BWSSB lifted the cover of the manhole and repaired the same leveling the same to the new road level The debris which was lifted ...