For Voltage improvement
Miscellaneous Work

Miscellaneous

New Lines Charging

Sir,

Under Thodupuzha No.1 section, from pole no. P.V.08, near Purapuzha jn; to our residence area, 500mtrs; newly toyed 2 additional phases along through old one, for voltage improvement. No.1 A.E's supervision, on 10th & 11th of Nov.09. the work has done. But the lines are touching each other & other trees because of the careless toying. They are not properly installed the appropriate stays to the poles and one of them has not stay. For e.g. Used the old wooden pole’s crossbar on the concrete pole, the lines are too loose, and have no string. The cross arms are used different types.

The clearance is not maintained between the upper cross and lower cross. We have told these things to the A.E; at the time of work, but not minded.

We request you to, stop the payments to the above work done & charge the lines after make sure it correctly as early under the rules and regulations of Electrical Inspectorate.

Yours faithfully,

Purapuzha. Jayan & Others. Purapuzha. 685583.

17/11

..


Company: For Voltage improvement
Country: India
  <     >  

RELATED COMPLAINTS

Low voltage & voltage fluctaion
Low voltage & voltage fluctaion

Low Voltage/Voltage fluctuation
Low Voltage/Voltage fluctuation

ECE Industries Limited
Malfucntion of Lifts at our residential complex "ARUNIMA PALACE"

Low Voltage/Voltage fluctation
Low Voltage/Voltage fluctation

MICROTEK TWIN GUARD 1000VA UPS TGE1000
MICROTEK TWIN GUARD 1000VA UPS TGE1000 FRAUD Company

MPEB
Electricity Bill/Low Voltage/Voltage Fluctuation

Pegassus gym n spa
Very low voltage noted less than 150 no action from bses after so many reminders no action