New Lines Charging
Sir,
Under Thodupuzha No.1 section, from pole no. P.V.08, near Purapuzha jn; to our residence area, 500mtrs; newly toyed 2 additional phases along through old one, for voltage improvement. No.1 A.E's supervision, on 10th & 11th of Nov.09. the work has done. But the lines are touching each other & other trees because of the careless toying. They are not properly installed the appropriate stays to the poles and one of them has not stay. For e.g. Used the old wooden pole’s crossbar on the concrete pole, the lines are too loose, and have no string. The cross arms are used different types.
The clearance is not maintained between the upper cross and lower cross. We have told these things to the A.E; at the time of work, but not minded.
We request you to, stop the payments to the above work done & charge the lines after make sure it correctly as early under the rules and regulations of Electrical Inspectorate.
Yours faithfully,
Purapuzha. Jayan & Others. Purapuzha. 685583.
17/11
..