GHMC
ROAD damage

Miscellaneous

At Erragada, Nellima hospital adjacent street road (gokul theatre backside) was digged by water works department contractor for pipe line laying purpose (24'' dia pipe). after laying pipe line road was not closed with proper sand & required filling. still road side lot of sand and unwanted materials lying in the road side, because of digging uneven surface not covered properly. up & down not filled, road is not usable. almost 50 feet road is spoiled by the pipe laying contractor, GHMC perosn not correctiong the mistakes and also not directing the contracot to correct the mistake. actually the above 50' road was cement road with levele nd also very recently laid.

Hence i am requeting the respective GHMC incharge inspect the same and direct the contarctor to correct the mistake. damged part has to be filled with cemet mixter.


Company: GHMC
Country: India
State: Andhra Pradesh
City: Hyderabad
  <     >  

RELATED COMPLAINTS

Greater Hyderabad Muncipal Corporation, Hyderabad, A.P
No action is being taken by GHMC, Circle 7, Khairtabad ACP&DCP to stop and demolish the constructions

GHMC- Hyderabad
Drainage Problem

GHMC MALKAJGIRI
Dereliction of duty-Dy Commssione

GHMC
GHMC Commioner asks residents to vacate

GHMC
Illegal Construction

Commissioner of Police, Cyberabad
Non Action against Land Grabbers at Nacharam

GHMC MALKAJGIRI
Non payment of House Rent

GHMC MALKAJGIRI
Exemption of tax by collusion