Inconsumercomplaints.com » Miscellaneous » Review / complaint: GHMC - ROAD damage | News #235825

GHMC
ROAD damage

At Erragada, Nellima hospital adjacent street road (gokul theatre backside) was digged by water works department contractor for pipe line laying purpose (24'' dia pipe). after laying pipe line road was not closed with proper sand & required filling. still road side lot of sand and unwanted materials lying in the road side, because of digging uneven surface not covered properly. up & down not filled, road is not usable. almost 50 feet road is spoiled by the pipe laying contractor, GHMC perosn not correctiong the mistakes and also not directing the contracot to correct the mistake. actually the above 50' road was cement road with levele nd also very recently laid.

Hence i am requeting the respective GHMC incharge inspect the same and direct the contarctor to correct the mistake. damged part has to be filled with cemet mixter.


Company: GHMC

Country: India   State: Andhra Pradesh   City: Hyderabad

Category: Miscellaneous

0 comments

Information
Only registered users can leave comments.
Please Register on our website, it will take a few seconds.




Quick Registration via social networks:
Login with FacebookLogin with Google