MMRDA
Bridge not completed

Miscellaneous

Hi

I am travelling from Airoli to Powai daily. I see a lot of traffic jam at Gandhi Nagar overbirdge on local railway. The existing bridge is very narrow and only 1 bus or 2 cars can travel at a time (one side). So there is a huge bottleneck problem here as 4 lanes of highway is connected.

Already work started to extend the existing bridge and almost everything is ready but they are not completing the bridge. So I want to compaint on MMRDA as they are not finishing the contruction.

Thanks

Ravi C


Company: MMRDA
Country: India
State: Maharashtra
City: Mumbai City
  <     >  

RELATED COMPLAINTS

Denis Bullshit
Denis rascal

Denis rascal
Denis rascal

OCEAN BRIDGE SHIPPING INDUSTRY U.K
CONFIRMATION OF AUTHENTICITY

OCEAN BLUE SHIPPING UK
APPOINTMENT

Offer letter for job
Is this letter true

OCEAN BRIDGE SHIPPING INDUSTRY
Fake offer letter through mail

Ocean Bridge Shipping industry London
Recruitment

Job applicant
Affirmation letter from ocean bridge shipping is fake or genuine