Hi
I am travelling from Airoli to Powai daily. I see a lot of traffic jam at Gandhi Nagar overbirdge on local railway. The existing bridge is very narrow and only 1 bus or 2 cars can travel at a time (one side). So there is a huge bottleneck problem here as 4 lanes of highway is connected.
Already work started to extend the existing bridge and almost everything is ready but they are not completing the bridge. So I want to compaint on MMRDA as they are not finishing the contruction.
Thanks
Ravi C
0 comments