PWD HALDWANI, NAINITAL (U.K)
DAMAGE OF WATER CONNECTIONS, UNPLANNED NAHAR COVERING, UNUSEFUL DRAIN WORK

Politics & Government

Nahar covering work is in progress since last three years. todays costruction of drain is in progress. Here the top level of flow in rainy season is the existing top level of canal near Surbhi coloney. The invert level of drain in the junction of drain & canal is about 45-60 cm. below from top / flow level of canal. So otal falure of project & loss of money. The contractor is using JCB machine to excavate the drain, which is damaging the water connections of public. If it is necessary than first there should be Jal Sansthan plumbers at site to join the same because all connection charges are paid by us. Electric poles are in the alignment of drain. Public is suffering probles as they can not arrive thear homes by their cars/vehicles.

Kindly requested that do all developement work without creating problems to residents of Malli Bamori, Haldwani Distt- Nainital.

thanks sir.

Hoping u will do the best.

ALL RESIDENTS OF MALLI BAMORI, HALDWANI


Company: PWD HALDWANI, NAINITAL (U.K)
Country: India
State: Uttarakhand
City: Nainital
  <     >  

RELATED COMPLAINTS

Domestic lpg cylinder
NON DELIVERY OF DOMESTIC LPG

No WAter
DELHI JAL BOARD

Andhra Bank
Not logged in net banking

Delhi Jal Board
WATER RELATED

Agarwal Speed Link Pvt. Ltd
Reminder No.16: Cheated by Agarwal Speed Link Pvt. Ltd. - Beware of this Movers & Packers

OTHERS
Water, roads, sewage etc

MARUTI /WAGON-R
CHEATING IN SERVICE

INDANE DOMESTIC
Ur PHAGAWARA sales represantative

REDEVELOPMENT
REDEVELOPMENT OF HOUSING SOCIETIES