No Coordination & very slow progress on Drain works

Politics & Government

Since the last 8 months and still not done with the hassles of building 'DRAIN" on all the roads of Kumaraswamy layout.

We reside on 89th cross, Pipe line road and since more than 8 months the drain work is in progress and parts of the stretches are incomplete as the electric poles are in the way of the drain, the use of constructed drain is lost as the intent is not met. Also because of the rains, the built drains are already getting closed up because of soil / mud getting into them as the parts of them are open.

Can somebody take actions here as lots of public money is being spent on all of this and there is no proper coordination with the civic authorities and even the BESCOM. On many a parts the Sewage and water lines are damaged during the construction activity and inspite of many complaints to BWSSB they are being ignored.

Lots of water every alternate day is being lost and over and above this BWSSB is insisting on saving rain water by installing RWH. Does any of the authorities have sense of any responsibilities here.

I request the higher ups to visit the place to know the realities and ask the public of the inconvenience being caused for the last 8 months.

Regards

Ashwin


Company: Drain works & BESCOM
Country: India
State: Karnataka
City: Bangalore
  <     >  

RELATED COMPLAINTS

COMMODITY & SHARE TIPS
NSE BSE TIPS DONT COPY MSE RAJANJ CHENNAI

NSE BSE TIPS DONT COPY MSE RAJANJ CHENNAI
Dont copy our msg Rajendran

OVERNITE EXPRESS – Domestic & International Courier
Paket not deliver yet after 8days of dispatch

India Today Book Club
Order not deliver since MArch

Kyazoonga
CRICKET MATCH TICKET

Dhfl
Dhfl

OUTREACH, BANGALORE
GRATUITY, ARREARS, ANNUAL INCREMENT, LEAVE ENCASHMENT

OUTREACH
GRATUITY, HRA, LEAVE ENCASHMENT, ARREARS, ETC