Indian Railways
Late Running of Train
- 10-29-2011
- 198
Yesterday I have travelled by Train No.08056 Tirupati - Shalimar Super Fast Special Train. I have boarded the train at Gudur Junction where the scheduled departure is 22.00 whereas the train has departed at 23.30 one & half hour late. The scheduled arrival of the train is 09.15 am whereas the train reached Visakhapatnam at 12.30 PM which is 3 hours late from scheduled arrival time.
I do not why Indian Railways runs special trains as they will never run on time & all the ordinary passenger trains are run on schedule & keeping these special trains aside for no reason. However, Indian Railways has charged us Super Fast charges for these special train for running unreasonable late.
Indian Railways is taking the passengers for a ride & no body answered for late running which puts the passengers to face hardships.
My only suggestion is to stop running special trains & to manage with the existing trains as the Railways do not know how to run the trains on schedule time.
Company: Indian Railways
Country: India
State: Andhra Pradesh
City: Visakhapatnam