Electricity charge bill
Excess billing

A.S.Narayanan

A-7, Nav Abhinandhan

Kalu Nagar,

Dombivli (W)

29-12

The Executive Engineer

PC-4

MSED Co. Ltd

Dombivli (W).

Consumer No. 020012259086

Meter No. 9000359002

Excess Billing in pretext of Faulty Meter

Dear Sir,

I am consumer No. 020012259086 of M.S.E.D Co. Ltd. As I and my family were away in November the electric unit consumed showed 1 unit, but billed for 142 units (Ref. Meter reading in Meter No. 9000359002 shown in picture for November). Copies of Meter readings as shown in electric bills are attached for your perusal.

Excess billing for 142 units against consumption of 1 unit as shown in meter, is grossly unfair. Reason stated was faulty meter. I have personally explained that electric consumption is almost nil in November because of no occupancy. Please see my letter dated 29-11, which was acknowledged.

However, in December the electric consumption shown in meter was 27 units and I was billed for 27 units. Had the Meter been faulty, it would not have shown 27 units consumption.

I therefore the Officials concerned to reverse the faulty entry of 142 units of November and accordingly give credit to my account for the Rs. 200/- already paid by me.

I appreciate if the matter of unfair excess billing is resolved at the earliest.

Thanking you,

Yours faithfully,

A.S.Narayanan

Narayanan

Sr.

No.

Name of Call

Centre

**Area covered Toll Free

Telephone No.

1 Pune Pune & Pimpari Chinchwad Municipal

Corporation

1800 233 3435

2 Bhandup Thane Municipal Corporation and other

Urban Areas Mulund/ Bhandup etc.

1800 233 3435

Navi Mumbai Municipal Corporation and

other Urban Area of Panvel Taluka/ Panvel

Urban Division

3 Nagpur Nagpur Municipal Corporation 1800 233 3435

MIDC Division out of Nagpur Municipal

Corporation

4 Amravati Amravati Municipal Corporation 1800 233 3435

5 Akola Akola Municipal Corporation 1800 233 3435

6 Aurangabad Aurangabad Municipal Corporation 1800 233 3435

7 Ahmednagar Ahmednagar Municipal Corporation 1800 233 3435

8 Dhule Dhule Municipal Corporation 1800 233 3435

9 Nasik Nasik & Malegaon Municipal Corporation 1800 233 3435

10 Jalgaon Jalgaon Municipal Corporation 1800 233 3435

11 Kalyan Kalyan-Dimbivali & Ulhasnagar Municipal

Corporation

1800 233 3435

12 Nanded Nanded-Waghala Municipal Corporation 1800 233 3435

13 Kolhapur Kolhapur Municipal Corporation 1800 233 3435

14 Sangli Sangli-Miraj-Koopwad Municipal

Corporation

1800 233 3435

15 Solapur Solapur Municipal Corporation 1800 233 3435

** MSEDCL Consumers in the jurisdiction of Municipal Corporation

area of respective Call Centre can avail services of Call Centre for

redressing complaints

Call Centres in MSEDCL

Details CC Phones 301105

PUBLIC RELATIONS DEPTT.

FAX :26475814

26474536 (P) R.S.Dotonde

Chief General Manager (CC) 28960787

26474211

Ext. 2302 (O) (MO) 9833383887

26474211, 26472131 (O) Sudhir C.Jadhav Dy. Chief Information & Public Relations Officer 25240320

Ext. 3512 (MO) 9960680017

Ext. 3617 P.S.Patil

Information & Public Relations Officer 28865145, (MO) 9833190106

World Trade Center, Center No.1, 13th Floor, Cuffe Parade, Colaba, Mumbai-400 005

Telephone No. : 091-22-2216 3964/65/69, Fax : 091-22-2216 3976

Email: [email protected]

> ABOUT MSEDCL

Company Profile

Board of Directors

Board Member of M.S.E.B. Holding.

Management Team

Statements of Accounts

Administration Report

Annual Plan

> CONSUMER SERVICES

View & Pay Bills Online

Request for E-Bill

Application Form

Bill Calculator

L.T. Bill Calculation Example

Know your Bill Format

Call Center Contact Details

Consumer Facilitation Centers

Electricity Consumer Rights

more...

> DISTRIBUTION LOSSES

> RIGHT TO INFORMATION ACT

> PROJECTS

> EMPLOYEE PORTAL

> PHOTO GALLERY

Major Events Photos

Theft of Electricity Photos

> THEFT OF ELECTRICITY

Provisions Of Act

Photos Of Theft Detected

> PRESS RELEASES

> MSEDCL ARCHIVES

> REGULATORY INFO

Appellate Tribunal

CERC

MERC

> CONSUMER GRIEVANCE

REDRESSAL / FORUMS

> LOAD MANAGEMENT

Load Shedding Protocol

Reliability Indices new!

Daily Power Position

Feeder Hourly Data

> HR DEPARTMENT

> SUPPLIER SERVICES

E-Tendering for supply of material

E-Tendering for works and contract

Other Tenders

Disposal of Scrap

Conditions For Tender & Supply

Do's And Don't

Purchase Procedure

Annual Purchases

Distribution technical specifications of material

> IMPORTANT LINKS

Govt Of Maharashtra

Govt Of India

Ministry Of Power

Appellate Tribunal

Power Finance Corporation

Additional Links

> MISCELLANEOUS

Frequently Asked Questions

MSEDCL is extending power supply to the consumers depending upon the purpose for which it is being utilised.

Q 1. Why MSEDCL is asking for additional security deposit? new!

Q 2. How to Become an MSEDCL Consumer? What are the requirements for new connection?

Q 3. What is the procedure of Billing?

Q 4. How to increase sanctioned load?

Q 5. How to check one's consumption?

Q 6. How to lodge the complaint?

Q 7. How to ensure safety?

Q 1. Why MSEDCL is asking for additional security deposit?

Ans 1. As per condition of supply, all State Electricity Boards are empowered to collect security deposit from their consumers.

Security Deposit is necessary because all consumer pay their bill after consumption of electricity. They pay only after they receive bill for their consumption in previous month. They are also given a period of 10 to 15 days to pay the bill. Even if any consumer does not pay the bill, his supply can be cut only after serving him a notice and after giving a period of 15 days to make the payment. Thus a non - paying consumer can use electricity for about 2 months. To avoid losses in such cases, security deposit equivalent to electricity consumption of one month is collected from every monthly billed domestic consumer. This period may vary as per the duration of the billing.

Lately, MSEDCL has revised his tariff. So, additional security deposit as per revised tariff is necessary. It may also be mentioned here that MSEDCL pays interest on the security deposit of Rs. 50 or more at the rate equal to the post office saving bank rate as may be in the force from time to time.

Back to top

Q 2. How to Become an MSEDCL Consumer? What are the requirements for new connection?

Ans. 2. i) The prospective consumer should be lawful owner / occupier of premises.

ii) He should apply in A-1 form at the section office domestic/commercial and for industrial at Sub-division/division along with no objection certificate required

iii) After load survey, he will be given quotation for payment of charges which includes Service connection charges, Service Line Charges, Security deposit etc.

iv) After payment of above charges the consumer will submit a Test report from the Licensed electrical contractor for the wiring.

v) The service connection will be released as per the chronological order.

Back to top

Q 3. What is the procedure of Billing?

Ans 3. After installation the billing section is supplied with data containing Meter details, initial meter reading. As per the predetermined cyclic order the first bill is issued. The bills are issued monthly, bimonthly and quarterly for Domestic, non-domestic, industrial, Agricultural consumers. The payment of bills is to be made as per the last due date shown on the bill.

Back to top

Q 4. How to increase sanctioned load?

Ans 4. For increasing the sanctioned load the domestic, commercial and industrial (LT) consumers should apply to the concerned Sectional and Sub-divisional in charge. The HT consumers should apply to the Superintending Engineer. After confirming the feasibility, the load is sanctioned and the quotation is issued which includes additional Service Line Charges, Security deposit.

Back to top

Q 5. How to check one's consumption?

Ans 5. The consumption depends on the capacity of appliance and period for which it is in use. The following link will help you to Know your estimated consumption.

Back to top

Q 6. How to lodge the complaint?

Ans 6.

I) In case of failure of supply the consumer has to contact the nearest fuse-off call center either on Telephone or in person to lodge a complaint or he has to call the call center in that area. The complaint registers are kept at various convenient location. The consumer has to lodge a complaint by giving details like, Name, Location, Consumer No., and Pole No. for easy access to MSEDCL employees. MSEDCL is not charging any extra charges for attending fuse-off-call complaints.

II) If, there is a major fault, the electric supply of complete area goes off, it may take some longer duration for restoration of Supply.

III) If, there is some anomaly in the energy bill like Wrong reading, arrears amount shown though the bill is paid, etc. the consumer may contact to the nearest MSEDCL office & bring the anomaly to notice of concerned for rectification. In Urban areas Division office is dealing with the billing complaints and in Rural areas the Distribution Center or Subdivision office are dealing the billing problems. (For more information)

IV) If, there is abnormal delay in settling the complaints lodged consumer may contact to Higher officers in their office on any working days.

V) MSEDCL is providing their fuse man at Consumers premise, if desired by the consumer, at nominal prescribed rates for some special occasions for early restoration of electric supply.

Back to top

Q 7. How to ensure safety?

Ans 7.

1. Consumer should install safety equipments like Earth leakage / overload & short circuit protection (circuit breakers / switches) near point of supply.

2. Healthy earthing should be installed at your premises.

3. ISI marked cables and equipments of proper capacity should be used for installation and wiring should be done through only licensed Electrical Contractors.

4. Always use proper capacity fuse wire in main switches.

5. For rectification of faults in your installations, call licensed electrical contractors only. For any difficulty related to electricity supply, always contact MSEDCL authorities at their offices.

6. Do not connect multiple equipments to a single point out lay to avoid excess loading. Avoid loose connections and joints.

7. Do not use bare wires for extending supply from one point to other or from one premises to other premises. It is hazardous and causes accidents. Do not meddle with live wires / points. It may cost your life.

Back to top

Home | Locations | Feedback | Links | FAQs | Sitemap | Disclaimer | Contact | Search

Copyright © 2007 MSEDCL All rights reserved.


Company: Electricity charge bill

Country: India

Category: Miscellaneous

0 comments

Information
Only registered users can leave comments.
Please Register on our website, it will take a few seconds.




Quick Registration via social networks:
Login with FacebookLogin with Google