ROURKELA SINTER PLANT IN TROUBLE...
ROUKLELA SINTER PLANT CRANE ELECTRICS ARE DESIGNED BY ARMSEL MAHE PVT.LTD.
CRANES ELECTRICS ARE CHECKED BY CUNSULATANT: MECON LIMITED RANCHI.
CRANES ELECTRICS CHECKED BY MR. MSSN MURTHY.
MR MSSN MURTHY HAS TAKEN 65 THOUSAND RUPEES FOR CLEARING CRANE ELECTRICAL DRAWING FOR MANUFACTURING CLEARANCE. FROM DEBASISH CHATOPADHYAYA OF L&T ECC KOLKATA.
IT WAS TOTAL AMMOUNT OF 1 LAKH. RECEIVED FROM ARMSEL MAHE PVT LTD BY DEBASISH.
RSP SP #3 CRANES ELECTRIC AL ARE HAVING FOLLOWING ERRORS AS PER CONTRACT SAIL ROURKELA SINTER PLANT –PHASE -3
• AMMETER AND VOLTMETER WAS TO BE PROVIDED ON DC SIDE OF ELECTROMAGNET BUT THERE IS NOT.
• IN CASE OF FOUR MOTOR DRIVE AND EACH PAIR OF MOTORS SHALL BE ABLE TODRIVE THE CRANE AT REDUCED ACCELERATION AND SPEED.AS AN ANTI-SKWING MEASURES OUT OF PAIR OF MOTORS FOR LT.IF ONE DRIVE MOTOR TRIPS, THEOTHER DRIVE MOTOR DRIVE SHALL BE SWICHED OFF……BUT SO NOT.
• SPEED FEED BACK SHALL BE FROM TACHO GENERATOR
• BRAKS SHALL NOT BE USED FOR SPEED CONTROL
• ANTI VIBRAION PAD.
• HINGED DOOR
• MOTOR CURRENT AND MOTOR VOLTAGE ON PANEL
• SEPARATE SET OF PARKING BREAK
• ANTI COLLISION DEVICE WAS TO PROVIDEDED
• ELECTROMAGNETS FOR BREAKS AS PER CONTRACT
WHENEVER THE SPECIFIED A SET OF BATARIES, A BATARERY CHARGER, ONE ANNUNCIATION SYSTEM AND OTHER ACCESSORIES SHALL BE PROVIDED ALONG WITH MAGNET SO THAT THE MAGNET CAN HOLD THE FULL LOAD CURRENT FOR ATLEASR HALF AN HOUR IN CASE OF POWER FAILURE.
NOTE: PLEASE CHEAK ALL THE CRANE ELECTRICAL DRAWINGS APPROVED BY MR.MSSN MURTHY.