Dear Sir,
I am a farmer from Bramhanpade Tal: Satana (Baglan) Nasik. I have a electric connection for water electric pump. From lat 15 days the transformer gets bursted, i have submitted same transormer in respective workshop at Lohaner in baglan taluka. But the officerrs those are their not responding our queries. They said it will take 1 month time to rewindening the transformer. Already we have faced the problem from last 15 days, and if we wait next one month then our crop totally gets collapesed.
Please do needfull.
Thanks.
0 comments