Inconsumercomplaints.com » Real Estate » Review / complaint: Builder - Issues with our builde | News #160485

Builder
Issues with our builde

Hello Sir,

This is about issues we are facing with our builder in many aspects.

We bought flats from a novice builder. During registration of the flats he has given/committed to few specifications for the Flat/Apartment, but towards the end he failed to provide many specifications. I have listed down few major issues we had with him.

0. He committed in the document to complete the construction by May' 10 and agreed to pay Rs. 6000/- as penalty per month. But he literally delayed the venture by at least a year and simply ignoring his words and registered documents when we asked for the same, saying that no builder will actually give such penalties.

1. He failed to provided water (either from Bore or from Municipality connection)

- He pushed digging bore towards the end of final disbursements and finally found that water is not there in our plots after he dig the bore during the time of our occupation, which is too late for us to stop giving funds.

- He sold the flats for us claiming that we have ample ground water

- By knowing the fact earlier we would have bought it for lesser price or even ignored his venture

2. There is a seepage problem in lift room because of which we faced problems with left many times.. we raised at least 20 complaints with in a span of 6 months.

3. He promised to give generator backup for light and fan in each room but finally provided only for single bulb

- And its not capable of running Lift and Motor for pumping water to overhead tank at a time

4. He promised Intercom but finally installed some cheap quality phones which are not actually intercom but one way communication from watchman to flat

5. Quality of construction is also not good, at many places on internal walls, we are observing wet spots and paint is torn away because of that

With many such pending things in place, he came to hand over the house last month. But we insisted him to complete the things and hand over properly.

Yesterday he stopped supplying usage water all of a sudden without prior notice/ handover of flats. :-(

If this is not the right place, kindly advice me where/how to proceed.

Thanks,

Krishna


Company: Builder

Country: India   State: Andhra Pradesh   City: Rangareddy

Category: Real Estate

0 comments

Information
Only registered users can leave comments.
Please Register on our website, it will take a few seconds.




Quick Registration via social networks:
Login with FacebookLogin with Google