After 1.5 yrs the department changed my electric meter, whenever the display of meter was not working (fault of company, not my). during this period i give the average bill . now when metr is change then it is very fast, The main display is showing zero unit and in other mode it show very fast . in two days 24 units, whenever the consuption of electricity is not according to unit . when there is power cut off the meter is still showing the units consistently.
0 comments