BBMP recently relaid the 4th Cross Cambridge Road about 10 days back. This was done after a gap of 5 years. Last resurfacing was done in 2004
The Quality of the Resurfacing work was so bad that the paving material and Tar has come out and the road in 10 days.
The road now looks as bad as it was before the paving other than the dark Tar color which gives it a look of repaved road.
The road needs to be laid again with proper supervision of the contractor and ensuring that the work is done properly
0 comments