I had purchased one godrej lock on 20th September'09. I have been told that installation would be done within 72 hours. I called vendor 3 times and more than 5 times to contractor who would installed the lock. I had also lodged complaint on their web sites but till date lock is not installed. One can under stand that lock on main gate is so important with safety point of view.
0 comments